Project: CH750-SR   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:Skip Rhudy   -  
Project:   Zenair - CH 750   -   VIEW REPORTS
Total Hours:551
Total Flight Time:
Total Expense:N/A
Start/Last Date:Sep 17, 2019 - No Finish Date
Engine:Corvair
Propeller:Sensenich W642KL-35GS
 
Friendly URL: https://eaabuilderslog.org?s=CH750-SR

Home or Last Project Picture

Feb 11, 2023     Landing Gear / Wheels / Tires - (3.5 hours)       Category: Landing Gear
Assembled wheels into tires. Ran 1/16 in. bead of Permatex Ultra Grey (82194) high torque gasket maker around the face of one side of the wheel assembly to ensure no leakage between wheel halves. Placed lower wheel on 2x4 wood blocks under tire. Placed upper wheel half onto lower and bolted tight with all six bolts. Then placed the rubber o-ring at the wheel join. Used a lot of watery dish soap as lubricant during tire inflation, used ratchet strap to compress center of tire during inflation to seat bead onto rim.

Gear installation preceded tire / wheel assembly.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.